Review bonding and power together
Pool and spa electrical work needs the supply, protection, disconnects and bonding reviewed together. The existing equipment and construction determine what must be assessed and what access is available. Bring electrical planning into the project before the deck and other finishes are completed, and identify responsibilities with the pool contractor and equipment supplier.

Equipment circuits and disconnects
Pumps, heaters, salt systems, blowers, controls and lighting can have different electrical requirements. Review the manufacturer’s specifications against the existing supply before connecting replacement or added equipment. The scope should identify circuits, required protection, disconnects and distribution changes, including whether the equipment pad needs additional panel work.
Everything else outside
The same job often takes in the rest of the property's outdoor electrical: gates and gate operators, well and booster pumps, irrigation controllers, sheds and outbuildings, and the lighting around all of it. These share the same constraints — weather-rated enclosures and fittings, correct burial depth and conduit, GFCI protection, and conductor sizing that accounts for the run length. On larger and hillside lots those runs get long enough that voltage drop becomes a design calculation rather than a detail.
Common questions
Someone felt a tingle in the pool. What does that mean?
Stop using the pool and call us. A tingling sensation means there is a voltage difference between things a swimmer is touching, which usually points to missing or broken bonding, or a fault in equipment on the circuit. It is not something to monitor and see if it happens again. It should be diagnosed properly before anyone gets back in.
My pool is old. Can bonding be added now?
Often yes, though how much work it takes depends on what is accessible. Equipment, rails, ladders and fittings can usually be bonded without major disruption. Shell reinforcement is only accessible during construction, so for older pools the assessment is about what can be achieved and what the practical limitations are. We will be straight with you about both.
Do I need a new circuit for a variable-speed pump?
A replacement pump may have different supply requirements, so the manufacturer’s information and existing circuit need review. A new circuit is not assumed simply because the pump is variable-speed. Share the selected model and existing equipment information so the proposed work can be assessed.
Technical planning notes & references
BEFORE WE QUOTE THE WORK
Match power to the complete pool or spa installation
Use the equipment specifications
Pumps, heaters, controls and packaged spas have different supply needs. Provide manufacturer information and the proposed location. Existing power at the equipment pad may not suit a replacement or added load.
Assess protection and bonding together
Protective devices, disconnects, bonding and placement need review for the actual installation. Water-adjacent equipment requires professional work suited to the location, rather than improvised extensions or adapters.