Build the inventory by building and equipment location
Use a simple worksheet with one row per equipment location. Record the building or common area, the label on the enclosure, the number of meter positions or panels you can confirm from records, and the work the property team is requesting. Give each row a reference such as Building A meter bank or clubhouse panel. Note whether the source is a drawing, an equipment list or a site photo so the electrician knows what still needs a field check.
Use safe photographs to show context
From an authorized, safe position, take a wide photo showing where the equipment sits and a closer photo of any readable exterior labels. Keep covers closed and stay clear of damaged or exposed equipment. If the label cannot be read safely, mark it as unknown and leave it for the electrician. Use the same worksheet reference in the photo name and keep resident names, account details and private access information out of the photo set.
Separate the equipment scope from the unit count
List the meter banks, the unit panels and shared equipment separately. Add common-area loads that may be affected, such as gates, corridor lighting, laundry or elevators, if the property has them. A meter count and a panel count answer different questions. In Los Feliz, our completed work included eight meters and nine subpanels. At the Culver City property, the project included 532 meters, about 350 in-unit subpanels and separate switchgear for common areas and elevators.
Flag uncertain labels and utility decisions
Keep a short list of missing, conflicting or unreadable labels for the electrician to verify. Include any utility notes already received and identify the utility that serves the property. LADWP provides separate planning guidance for multifamily and larger service installations in its territory. Confirm the equipment, metering arrangements and utility steps for this property before using the inventory to finalize orders, shutdown notices or installation dates.
Hand over the records that explain the request
Send the worksheet, available drawings and circuit directories, exterior photos and any utility correspondence to the electrical contractor. Include the reason for replacement, who can authorize decisions and how to arrange access for the field visit. Ask the contractor to identify what was verified, what remains open and what falls outside the proposed scope.