Project record by Ai Builders Electric
- Los Feliz, Los AngelesLocation
- MultifamilyProperty type
- 8Meters installed
- 9Subpanels installed
- CompleteStatus
Metering and distribution
The project included both the meters and the downstream subpanels. The meter equipment is visible on the exterior wall. Including the meter and panel counts separately helps define which equipment is part of a similar project.
What the photographs show
One view shows exposed wall framing beside the electrical equipment. A second shows the conduit and enclosures at the service area. The meter-bank photograph shows the installed exterior equipment with its associated conduit.
Planning a similar multifamily upgrade
Tell us how many meters and subpanels are involved, where the equipment is located and who can coordinate access. Share any existing electrical plans, utility correspondence and known access restrictions so we can discuss the scope.
More views of the work


