Electrical upgrades across a Culver City multifamily property
Completed electrical work across 14 buildings and a clubhouse, connecting property-wide service and metering equipment with approximately 350 in-unit subpanels.
- 14 buildingsplus the clubhouse
- 532 meterscompleted metering scope
- About 350in-unit subpanels
- 15 assembliescommon-area and elevator switchgear
Shared equipment and individual homes
The completed work included metering and distribution for the property, together with unit subpanels. The scope included 600A single-phase 120/240V sections and 15 common-area and elevator 400A three-phase switchgear assemblies.
Look at the installed work
These photographs show the metering equipment, service cabinets and conduit.
Discussing a similar property
Bring the existing meter and panel information, the units or buildings involved and any planned new loads. Access, utility coordination and the relationship between shared equipment and unit work belong in the initial review.
Plan the work for your property.
Tell us your city, the equipment involved and the buildings or units affected. Include available drawings and meter counts.
Estimates based on plans and site visits are free. Troubleshooting and diagnostic work are chargeable; we discuss the cost before that work begins.