Project record by Ai Builders Electric
- MultifamilyProperty type
- 2Meter bank sections
- 400 ampsDisconnect rating per section
- 24Meter positions per section
- 48Total meter positions
The replacement scope
The work covered two sections of shared metering equipment. Each section had its own 400-amp disconnect and 24 meter positions. The 48 positions describe the installed metering equipment.
Meter equipment before and after replacement
These photographs show the existing and installed equipment at the same Van Nuys project. The before photograph is a close-up. The installed view was taken from farther away.


Drag the slider or use the arrow keys. Use either button to see the entire view.
Planning a similar replacement
Share the number of sections and meter positions, the known disconnect ratings and the property type when you request a review. Let us know who coordinates building access and utility communication. Existing equipment photos and records are helpful when they are available.