Electrical work in Malibu
Exterior electrical equipment, detached loads and installation access need review at the actual property. We discuss the service condition, proposed equipment and route before defining replacement or new installation work. If backup power is part of the project, its loads and operating requirements should be scoped separately.
Common questions
How big a generator do I need?
Start with the circuits and equipment you want to run, including motor starting demand and how long backup may be needed. That determines the required power rather than the size of the house alone. Fuel, maintenance, location and a suitable connection arrangement also matter. We review the chosen loads before comparing an essential-circuit design with broader backup.
Official references: CPUC: shutoff and backup-power questions
Do you take on rebuild work after fire loss?
Yes. Share the rebuilding plans, construction stage and project contact. Service and meter locations, utility requirements, rough-in, inspections and finishes need coordination with the construction schedule. Existing equipment should only be carried into the plan after its suitability has been reviewed.
